Preparation and inspection before the generator starting
Update:2018-07-11 18:50 Tags:
Preparation and inspection before the generator starting

In general, we will be surprised how the diesel generator manufacturers check the operation of the unit, after all, as a diesel generator users, we do not have too much knowledge.But when we use the generator,it is necessary to checks the generators, so let me tell you how the diesel generator manufacturers check the unit. The following are the general steps of the inspection of the unit introduced by Huaquan Power

Preparation and inspection of diesel generators before starting

1, The diesel generator is not allowed to start before the check and start the preparatory work finished,the operating mode selector switch should be in the "OFF" position.

2, Diesel generator start or put into operation mode should check the battery charging power supply, control, signal system power supply, cooling water temperature control, air system, fuel system, oil system into normal.

3, close the battery charging power, check the charging source red light and the battery voltage is (24V-30V) around, the battery capacity should meet the unit starting 9 times of power capacity.

4, check the cooling water temperature heater power and make sure the red light on.

5, check the indoor fuel tank (to meet the unit running for 8 hours of full load) oil level normal, open the diesel generator throttle. The oil way is manual.

6, Before the fuel system start remove the air, otherwise it will affect the engine and can not start normally.

--------------------------------------------------------------------------------------
TEL: +86 536 8185702
Mob:+86 15905360231
SKYPE: huaquanpower
Wechat/whatApp:+86 15905360231
EMAIL: hqpower@huaquanpower.com
ADD: Xinzheng Industrial Park,Qingyuan West Street,Weifang Economic Development Zone,Shandong Province,China
--------------------------------------------------------------------------------------
Copyright Weifang Huaquan Power Machinery Co.,Ltd
Powered by Huaquan